Renewables at >50% in European grids

Archives for Uncategorized

Simulations take on a great importance in the investigation of demonstrator networks’ handling and operations in scenarios which differ from the Business-as-Usual. Furthermore, simulations serve as a testing, de-risking and validation environment for the other tools, in preparation of their deployment in the physical demonstrations’ set-ups. Therefore, the simulations presented and described in Deliverable D6.3… » read more

Posted by EU-SysFlex Project

European 2030 Climate and Energy Policy Framework set an EU target of at least 32% for the share of renewable energy in the final energy consumption in the EU in 2030. This translates into electricity consumption originating from at least 50% renewable energy sources [1]-[4]. As RES have an uncertain output and a highly variable… » read more

Posted by EU-SysFlex Project

The efficient use of flexibilities requires smooth TSO/DSO coordination, but also raises the question of interface to the flexibility markets and their role. Recently published Deliverable D3.2 on “Conceptual market organisations for the provision of innovative system services” gives answers to these questions. As not only the vast majority of renewable energy, but also increasing… » read more

Posted by EU-SysFlex Project

Introduction Higher penetration of renewables will lead to new flexibility and ancillary services requirements to ensure the reliability of the power system. The provision of the system services such as frequency and voltage controls – so far mainly supplied by conventional synchronous units – would also be required for variable renewable generation connection or supplied… » read more

Posted by EU-SysFlex Project

Since the beginning of 2020, a field test demonstrator was set up at MITNETZ STROM. This demonstrator consists of an innovative grid and data integration functionalities which support more planning options and hence more stable grid operation as well as an improved communication between Transmission System Operator (TSO) and Distribution System Operator (DSO). In Figure… » read more

Posted by EU-SysFlex Project

Determining the potential of an aggregation of 727 houses can provide for manual Frequency Restoration Reserves in the Finnish market. The consumption of electricity of 727 households in the Helsinki area is modelled and forecasted in order to identify their ability to provide services to the Finnish transmission system operator (TSO). In the current system,… » read more

Posted by EU-SysFlex Project

The work done in EU-SysFlex data management stream up to now has brought our attention to ten building blocks, including aspects like legal and technical requirements, data privacy and cybersecurity, TSO-DSO coordination. Out of these the development of an interoperable data exchange conceptual model for cross-border and cross-sector data exchange is the central one. Happy… » read more

Posted by EU-SysFlex Project

An industrial sized battery energy storage system (BESS) located in an urban district in Helsinki has provided a research platform for Helen, an energy company in Finland, since summer 2016. The BESS, rated 1.2 MVA / 600 kWh, was the largest battery energy storage system in Nordic countries at the time of its installation. The… » read more

Posted by EU-SysFlex Project

In order to realize the overall goal of boosting the share of renewables in the European grids to at least 50%, the grid simulator is an important tool in development and operation of innovative optimization, The example of the German demonstration shows some innovative conceptions in using flexible data-driven grid simulator. As described in EU-SysFlex’s… » read more

Posted by EU-SysFlex Project